Providers: Mitchell International, ADP Claims Solutions Group, Motor
Information Services/CCC Information Systems Original Time Allowance: 7.0 Original Labor Note: Section as indicated in
graphics offered Issue:
- Procedure information from Manufacturer is vague and
inaccurate. There are three different levels of information available for this
operation and none of them offer precise information.
- Labor foot note inaccurate. The rocker must be removed to
access the area where the Quarter and Rocker join. To properly replace the
quarter it also requires the rocker to be replaced in conjunction with the
quarter, even though it may not be damaged
Response:
- Motor/CCC Footnote: "After Rocker
is Removed" has been added to the "Quarter" & "Section Quarter"
group.
- ADP Labor operation takes into consideration the rocker
panel removed. No changes are warranted
- Mitchell Has performed a time study and adjusted the
rocker panel replacement allowance to reflect the need to remove the quarter
panel.
Results/Change MitchellAllows 7.0
hours to section the quarter and 7.0 hours for the rocker panel. This procedure
is now a 14.0-hour operation. Although, the 14.0 hours may not be realistic in
most real world working environments, it is an improvement from what was
originally offered.
| Mitchell |
May 2000 |
Has performed a time study and adjusted the
rocker panel replacement allowance to reflect the need to remove the quarter
panel. |
| Motor |
July 16, 2001 |
Footnote: "After Rocker is
Removed" has been added to the "Quarter" & "Section Quarter"
group. |
| ADP |
October 24, 2000 |
labor operation takes
into consideration the rocker panel removed. No changes are warranted. |