| CIC
Data Base Inquiry Reference No. 129 1998-2001 Subaru Forrester R&R Rear Side Rail (#52150FC220) |
|
|
Date of Inquiry: October 5th 2001 Posted to Website: August 6, 2003 Time
allowance:
Mitchell
8.0 hrs (with floor pan removed)
Motor/CCC
7.5 hrs (no
labor text notations)
ADP
presently not known Issue: ¨
Motor/CCC 1.
Has no labor text notes for operation 2.
Has not recognized floor pan access removal 3.
Insufficient time allowance ¨
Mitchell
(no change required) 1.
Recognizes floor pan removal 2.
P-page (#26) states: “All
parts attached to or parts to be removed for access are not included
(example: suspension assemblies, axle assembly, fuel tank, fluid
lines, interior trim). Estimate necessary time for frame set up.” ¨
ADP 1.
Awaiting for “labor-report”
Response:
Mitchell Not
required ¨
ADP
Pending ¨
Motor/CCC
Suggestion: ¨
Motor
1.
Offer detailed “labor text note” 2.
Recognize the floor pan removal 3.
Do actual “time study and/or increase time allowance to
reflect all required operations ¨
ADP 1.
Waiting for response |
|