CIC
Data Base Inquiry R&R A-Pillar |
|
|
Date of Request:
December 21, 2002
Labor
text note:
None
Motor
12.5
Labor
text note:
With all bolted parts removed
ADP
Presently not known
CCC
Same as Motor
Labor
text note:
Same as Motor
Inquiry
(as stated by inquirer) To replace the A-Pillar and/or uniside the front upper
rail reinforcement panel must be removed because it overlaps the
A-Pillar. Suggestion
To
All: 1.
Please indicate in a “labor note” the required removal of
the upper reinforcement rail to facilitate pillar installation.
Responses:
Mitchell: January 7, 2003 Manufacturer information is oftentimes unclear as to which panels need to be removed in order to facilitate removal of inner panels. Moreover, on-site field inspections and time studies demonstrate varied feedback as to when an overlapping panel would require complete or partial removal for access to underlying panels. Therefore, Mitchell addresses these types of issues in our Procedure Pages in the form of the following important reminder: Labor times for inner panels, rails or reinforcements are with outer panels removed.
MOTOR: January 13, 2003 Added footnote: "Time is after upper rail is removed.", reviewed labor times and added Overlap & Sectioning Operations.
ADP: January 3, 2003 Increased the replacement time on G/N's 0183/0184 for all three vehicles by 1.5 hrs for each side. This change will be available on the Feb. 2003 CD. |
|