The Toyota Production System and “On Time” Collision Repair

8/10/01


Click here to start


Table of Contents

The Toyota Production System and “On Time” Collision Repair

On Time Configuration: Light Damage Line

On Time Configuration: (Alternative Track-style Layout)

On Time Configuration: High Production Light Damage Line

Discussion Topics:

Cycle Time:

Cycle Time Milestones:

TPS Concepts:

The Three M’s:

Eliminating Waste

Kaizen

Implementing TPS

On Time Concepts

On Time Configuration: (Cycle Time = 90 min. / 9.0 hours)

On Time Configuration: (Cycle Time = 30 min. / 5.0 hours)

Resources:

Author: shfield1

Download presentation source